Lancair Super ES (Kit, Partially Completed)
Posted: Tue Mar 26, 2024 5:33 pm
Lancair Super ES Kit, Standard Build
Partially completed
$55,000
Overview:
Fuselage, installed: Major bulkheads, firewall reinforcements and hard points, exhaust tunnels, spar box, main gear and fairings, seat support bulkheads, aileron controls assembly. H. Stab mounted to fuselage, V. Stab assembled and installed. All underbody work on fuselage completed and primed.
Wings, installed: Ribs / spars, All HW, VOR & AOA, fuel probes, aileron trim. Fuel proofed. Wings closed. Wings mated to fuselage (currently removed). Wing tips fitted to wings. Ailerons assembled and mated to wings (currently removed). Flaps assembled and mated to wings (currently removed).
Tail: H. Stab closed. Elevator assembled and mated to H. Stab. Elevator trim installed. Rudder built and mated to V. Stab. Fast build door.
Documents: Manuals, receipts, reference drawings, build logs and photos.
Located in Loveland, CO. Please email at LancairESColorado@icloud.com
Partially completed
$55,000
Overview:
Fuselage, installed: Major bulkheads, firewall reinforcements and hard points, exhaust tunnels, spar box, main gear and fairings, seat support bulkheads, aileron controls assembly. H. Stab mounted to fuselage, V. Stab assembled and installed. All underbody work on fuselage completed and primed.
Wings, installed: Ribs / spars, All HW, VOR & AOA, fuel probes, aileron trim. Fuel proofed. Wings closed. Wings mated to fuselage (currently removed). Wing tips fitted to wings. Ailerons assembled and mated to wings (currently removed). Flaps assembled and mated to wings (currently removed).
Tail: H. Stab closed. Elevator assembled and mated to H. Stab. Elevator trim installed. Rudder built and mated to V. Stab. Fast build door.
Documents: Manuals, receipts, reference drawings, build logs and photos.
Located in Loveland, CO. Please email at LancairESColorado@icloud.com